Sign In | Join Free | My himfr.com
Home > Pipe Fittings Tees >

1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee

    Buy cheap 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee from wholesalers
     
    Buy cheap 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee from wholesalers
    • Buy cheap 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee from wholesalers
    • Buy cheap 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee from wholesalers
    • Buy cheap 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee from wholesalers

    1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee

    Ask Lasest Price
    Brand Name : zexu
    Model Number : 1"-80"
    Certification : CE API ISO9001
    Price : 30-370000USD
    Payment Terms : T/T
    Supply Ability : 586700ton/Year
    Delivery Time : 6 work days
    • Product Details
    • Company Profile

    1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee

    ASME B16.9 Steel Seamless Reducing Tee Chemical Pipeline Connection Pipe Fittings


    The seamless three-way cold extrusion forming process is also known as the hydraulic bulging process, which is a forming process in which the branch pipe is expanded by the axial compensation of the metal material. The process is to use a special tee machine to inject liquid into a tube blank with the same diameter as the tee main pipe. The two horizontal side cylinders of the tee machine synchronize the centering motion to extrude the tube blank. The volume of the tube blank changes after being squeezed. Smaller, the pressure of the liquid in the billet increases as the volume of the billet becomes smaller. When the pressure required for the expansion of the three-way branch pipe is reached, the metal material moves along the mold cavity under the dual action of the side cylinder and the liquid pressure in the billet. Flow and expand out of the branch pipe. The whole process is formed by the axial compression of the tube blank and the bulging process of the branch part. The metal of the seamless cold extruded tee branch pipe is compensated by the axial movement of the tube blank, so it is also called the axial compensation process.


    Three links production process


    1. Blanking: First, blanking the standard of the butt welding tee to be produced. Cut the seamless pipe into sections according to the scale.
    2. Derusting: Put the cut pipe into the derusting equipment and tumbling and polishing to achieve the purpose of derusting.
    3. Kneading: Put the rusted pipe into the mold, and pour water into the pipe from the piston on one side of the mold, so that the pipe gathers toward the center under the pressure effect, and there is a hole under the mold. This hole is a release point for the tube to be kneaded, and then reaches the intention of making a tee.
    Four. Trimming: At this moment, the three links can only be called "two links", which means that the two ends are connected, and the central three links are only a raised straight pipe section. Cut off the raised straight pipe section, and then polish and process the groove of the product. In this way, the three links are basically formed.
    5. Heat treatment: Put the basically formed tee in a large annealing furnace to smolder it, let it cool naturally before taking it out.
    6. ​​Descale: Put the fired tee into the derusting equipment again to remove the oxide scale and ash on the support, and the product is complete. Large diameter tee Large diameter tee


    BUTT-WELDING PIPE FITTINGS DETAILS


    MATERIALCarbon Steel :
    ASTM, A234WPB, A234WPC, A420WPL6 ,Q235,10#, A3, Q235A, 20G,16Mn,
    DIN St37, St45.8, St52.4,St.35.8,St.35.8.
    Stainless Steel:
    1Cr18Ni9Ti 0Cr18Ni9 00Cr19Ni10 0Cr17Ni12Mo2Ti
    00Cr17Ni14Mo2 304 304L 316 316L
    Alloy Steel:
    16Mn Cr5Mo 12Cr1MoV 10CrMo910 15CrMo 12Cr2Mo1,
    A335P22 St45.8, ASTM A860 WPHY X42 X52 X60 X70
    STANDARDASTM / JIS / DIN / BS / GB/GOST
    MODEL1.Tee(Straight and Reducing) 2.180 DEG Return
    3.Elbow (45/90/180 DEG) 4.Cap
    5. Reducer(Concentric and Eccentric)
    TYPESeam Or Seamless
    ELBOW DEGREE45 degree, 90 degree, 180 degree
    SURFACEBlack Paint, Anti Rust Oil, Hot-Dipped Galvanize
    WALL THICKNESSSCH5S,SCH10S,SCH10,SCH20,SCH30,SCH40,STD,XS,SCH60,
    SCH80,SCH100,SCH120,SCH140,SCH160,XXS,2MM
    SIZE1/2"-48"(Dn15-Dn1200)
    CONNECTIONWelding
    SHAPEEqual, Reducing
    CERTIFICATEISO9001
    APPLICATIONPetroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc
    RELATED PRODUCTS1. Carbon steel nipples and sockets2. Flanges
    3. Malleable iron pipe fittings4. Pipes
    5. High-pressure fittings6. Valves
    7. P.T.F.E .thread seal tape8. Brass fittings
    9. Ductile iron pipe fittings10. Copper fittings
    11. Sanitary fittings, etc,.12. Grooved fittings
    Customers’ drawings or designs are available.
    PACKAGE1> 1/2" - 2" in cartons.
    2>Above 2" in wooden cases.
    Big size is workable by pallets.
    DELIVERY DETAILSAccording to the quantities and specifications of each order.
    Normal delivery time is from 30 to 45 days after receiving the deposit.

    1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee

    Quality 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hebei Zexu Pipe Manufacturing Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)