Sign In | Join Free | My himfr.com
Home > Steam Blowing Target Plate >

Power Plant Aluminum Customized Steam Blowing Target Plate

    Buy cheap Power Plant Aluminum Customized Steam Blowing Target Plate from wholesalers
     
    Buy cheap Power Plant Aluminum Customized Steam Blowing Target Plate from wholesalers
    • Buy cheap Power Plant Aluminum Customized Steam Blowing Target Plate from wholesalers
    • Buy cheap Power Plant Aluminum Customized Steam Blowing Target Plate from wholesalers
    • Buy cheap Power Plant Aluminum Customized Steam Blowing Target Plate from wholesalers

    Power Plant Aluminum Customized Steam Blowing Target Plate

    Ask Lasest Price
    Brand Name : Ze Xu
    Model Number : customizable
    Certification : API
    Price : USD 100 per piece
    Payment Terms : T/T
    Supply Ability : 10,000 pieces per month
    Delivery Time : 3-10 working days
    • Product Details
    • Company Profile

    Power Plant Aluminum Customized Steam Blowing Target Plate

    Power Plant Steam Purging Aluminum Target Plate, The Target Plate Frame Can Be Customized

    Packaging & Delivery
    Packaging Details:Wooden box, PE film, Bubble bag. e
    Lead Time:
    Quantity(Pieces)1 - 10>10
    Est. Time(days)25To be negotiated

    After the piping system is installed, it can be blown by air or steam according to the working conditions of the working medium and the degree of dirt on the inner surface of the pipe. The general requirements for pipe purge are:

    Equipment and pipes that are not allowed to be purged should be isolated from the purging system.

    Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces of equipment. The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.

    The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.

    A restricted area should be set before purging.


    After the pipeline has passed the purging, other operations that affect the cleaning shall not be carried out.


    1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections


    2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of dirt on the inner surface of the pipeline. The liquid or gas pipeline with a nominal diameter greater than or equal to 600mm should be manually cleaned, and the liquid pipeline with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.


    3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system


    4. The equipment and pipes that are not allowed to be purged are separated from the purging system.


    5. After the pipeline is qualified for purging, in addition to the required inspection and restoration work, no other work that affects the cleaning of the pipeline shall be performed, and the "Pipeline System Purging Record"



    Quality Power Plant Aluminum Customized Steam Blowing Target Plate for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hebei Zexu Pipe Manufacturing Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)